Easy 3 step installation
-
Place first module in required position. Apply weight to get pile footprint.
-
Dig hole on pile location to required depth. Level module with packers under joists.
-
Using dry ready mix, concrete module in place. Once dry, remove packers.
(Note - we also have a “no concrete” easy adjustable pile system available.)







